BSTt | See table (1) bellow
| Energy | The cost of purchasing energy from Oman Power and Water Procurement Company SAOC (OPWP). Defined as Bulk Supply Tariff (BSTt)
Applied to hourly kWh consumption
|
Tt
|
| Demand | - Transmission use of system charge is a demand
charge based on customers’ contribution to the transmission network’s average
system peak also known as Maximum Transmission System Demand (“MTSD”). MTSD is
calculated as an average across three snapshots during which total system
demand is at its highest (with the three snapshots at least 21 days apart).
Peak hours are normally achieved during the summer period.
|
Dt
| (4) Bz/KWH for premises connected to 33KV
network level, (5) Bz/KWH for premises connected to 11KV network level, (4)
Bz/KWH for premises connected to 0. 415KV network level
| Energy
| The charges for using the distribution network
that delivers electricity from the transmission substation to customers’
premises. Customers connected on the transmission network WILL NOT PAY
Distribution Charges, as they do not use the distribution network.
|
St | 50 RO/customer | Standing
| The cost of meter reading, billing, collection
and other services provided to the customer. This is a flat fee per customer,
regardless the annual consumption. |